PETROBRAS / TRANSPETRO.

- Contract Management, period of 02 years, for Mechanical Maintenance, Boilerwork and Piping of the entire Santos Waterway Terminal – S. Paulo – Brazil.
Contract Management, 01 year period, for disassembly, refurbishment and assembly of 07 Ship Loading Arms at the Santos Waterway Terminal – S. Paulo – Brazil.
Contract Management, period of 02 years, for maintenance of Utilities – Santos Waterway Terminal – S. Paulo – Brazil.
Contract Management, period of 02 years, for the project, manufacture and assembly of platforms, walkways and access stairs to Storage Tanks – Santos Waterway Terminal – S. Paulo – Brazil.
Outstanding Factor: Effective of 120 employees => 19 months with ‘zero accidents’.